โ๏ธ
How to Track PM Surya Ghar Subsidy Status 2026
PM Surya Ghar Tracking - track rooftop solar subsidy. Up to โน78K. Free electricity 300 units.
๐ Schemes
โฑ๏ธ 5-10 mins
๐ฐ Free
Visit Official Portal โ
About This Guide
Track PM Surya Ghar Muft Bijli Yojana subsidy status. Application stages: Application โ DISCOM Approval โ Vendor Selection โ Installation โ Commissioning โ Subsidy Release. Up to โน78,000 subsidy for residential 3kW+ rooftop solar. Free electricity up to 300 units/month.
Eligibility Criteria
- Indian household
- Existing electricity connection
- Roof space available
- Min 1kW capacity
- Residential consumer
- Aadhaar-bank linked
Documents Required
Keep these documents ready before starting application. Missing documents = delayed approval.
- Application reference number
- Aadhaar
- Mobile registered
- Latest electricity bill
- Bank account
Step-by-Step Application Process
Follow these steps in order. Each step is critical - skip none.
Visit Portal
pmsuryaghar.gov.in.
Login
Mobile + OTP or Application Number.
View Status
All stages tracked.
Stages
Application Submitted โ DISCOM Feasibility โ Vendor Quotes โ Selection โ Installation โ Inspection โ Net Metering โ Subsidy Released.
Issues
If stuck > 30 days, contact DISCOM.
Vendor Coordination
Approved vendor list on portal.
Key Benefits
- Up to โน78,000 subsidy
- 3kW residential standard
- Free 300 units/month
- 25-year solar panels
- Net metering benefits
- Reduces electricity bill
- Carbon footprint
- One Crore households target
What Happens After Application?
Total 60-180 days from application to subsidy. Real-time tracking.
Frequently Asked Questions
Subsidy structure?
1kW: โน30K, 2kW: โน60K, 3kW+: โน78K (max). Higher capacity: no extra subsidy beyond 3kW.