PM-KUSUM - 60-90% subsidy on solar agri pumps. Components A/B/C for different farm needs.
Visit Official Portal โPradhan Mantri Kisan Urja Suraksha Evam Utthaan Mahabhiyan (PM-KUSUM) provides solar agri pumps + grid-connected solar power for farmers. 3 Components: A (small grid plants), B (off-grid solar pumps - 60-90% subsidy), C (solarisation existing pumps). Apply via state agri/electricity department.
Keep these documents ready before starting application. Missing documents = delayed approval.
Follow these steps in order. Each step is critical - skip none.
60-180 days for installation + commissioning.